DEVELOPMENT OF A NEW TUNNEL UNDER THE FLOTATION BARREN VELIKI KRIVELJ

AUTHOR/S: S. KRSTIC, M. LUBOJEV, M. BUGARIN
Sunday 1 August 2010 by Libadmin2010

10th International Multidisciplinary Scientific GeoConference - SGEM2010, www.sgem.org, SGEM2010 Conference Proceedings/ ISBN 10: 954-91818-1-2, June 20-26, 2010, Vol. 1, 227-230 pp

ABSTRACT

Brief Development of tunnel would be partially through flotation tailing dump and
partially through rock massif. Krivelj`s river stream would be regulated by new tunnel,
because the old manifold could be destructed. Project No. 17004 (2008-2010) Ministry
of Science and Technology Development explored all aspects of the environment in
which the new tunnel is designed (primarily engineering-geological, hydrogeological
and petrology features).

Keywords: flotation barren, development of a new tunnel, groundmass, engineeringgeological, hydrogeological and petrology features