DBPapers
DOI: 10.5593/SGEM2014/B31/S12.090

TERRRAIN MEASUREMENTS AND CALIBRATION OF HYDRO DYNAMICAL MODEL OF THE WATER WORK DRAHOVCE - MADUNICE

P. Dusicka, R. Kveton, P. Sulek
Wednesday 1 October 2014 by Libadmin2014

References: 14th International Multidisciplinary Scientific GeoConference SGEM 2014, www.sgem.org, SGEM2014 Conference Proceedings, ISBN 978-619-7105-13-1 / ISSN 1314-2704, June 19-25, 2014, Book 3, Vol. 1, 699-706 pp

ABSTRACT
The simplest part of Vah hydroelectric system from the point of view of mathematical modelling is the water work Drahovce - Madunice. Modelling methods verified on other channel hydro power plants are easily applicable on this hydroelectric system. Last year was made by our department terrain measurements and research on this water work. The results of measurements were used for the better calibration of hydro dynamical model of this water work. The presented paper describes this process.

Keywords: hydropower plant, water work Madunice, hydraulic parameters, terrain measurements