IMPROVEMENT OF HIGH-PERFORMANCE LONGWALL FACE COMPLEXES EFFICIENCY AT UNDERGROUND EXTRACTION OF COAL

V. Zubov, G. Karpov
Wednesday 1 October 2014 by Libadmin2014

References: 14th International Multidisciplinary Scientific GeoConference SGEM 2014, www.sgem.org, SGEM2014 Conference Proceedings, ISBN 978-619-7105-09-4 / ISSN 1314-2704, June 19-25, 2014, Book 1, Vol. 3, 299-304 pp

ABSTRACT
In given article modern techniques of longwall complexes recovery are considered by the example of Kuzbass coal mines. The structure of time consumption required for longwall face recovery is given. The technique of recovery based on improving the stability of immediate roof, that allows reducing breakage face dead-time duration is recommended.

Keywords: recovery rooms, longwall face, immediate roof, roof caving, front abutment pressure